Fourth Annual Potluck on the Point

Please hold Saturday August 4th at 6:00 pm open to come join us for our Fourth Annual Potluck on the Point.  Last year was a great success with over seventy residents of Devils Lake in attendance. Come share some great food and fun with your lakeside neighbors.  The get together will be hosted by Mitch and Dana Moore at 2929 NE Loop Drive on Sand Point.

Plan to bring your favorite dish, appetizer, main dish or casserole and join us, with your neighbor and friends for an afternoon of fun. Watch your email for more details and be sure to mark your calendar today!

Leave a comment

Filed under About Town, Lakeside

Roads End Residents Need Your Help

Grant Application Deadline is June 30

The residents of Roads End are developing their own water system that once complete will serve over 800 people in Roads End. You can help and it won’t cost anything but a few minutes of your time. The Roads End Water District (REWD)  has signed up for a $250,000 small business grant from Chase Bank.  It needs at least 250 people to sign in though Facebook and show support for REWD in order to qualify. All you need is a Facebook account.  Anyone with a Facebook account can vote and they have managed to get quite a few votes. The deadline is Friday, June 30. Whether they get the grant or not, its a great way for one part of our community to help another.

Here are the instructions:

1.       Click on this link: https://www.missionsmallbusiness.com/

2.       Scroll down

3.       Use your Facebook name and password to log in.

4.       Scroll down

5.       Select State = Oregon

6.       Select City = Lincoln City

7.       Click on VOTE (for Roads End Water District)

8.       Log out – That’s all there is to it.

These instructions are also available on their website (. Using Facebook is the only method for voting and each Facebook account in your family can vote! Please don’t wait! Vote today.

Leave a comment

Filed under Annexation, Lakeside

Attend The July DLWID Meeting

Note New Date July 12, 2012 6:00pm

The Devils Lake Water Improvement District in its May meeting decided to move its regularly scheduled Board meetings to the second Thursday of every month beginning with the July meeting. The agenda for this month’s meeting on Thursday July 12th at 6:00pm, has not yet been published.  Due to the Districts consideration of lake level last month the meetings were very well attended.  The Water District makes important decisions regarding the lake every month and you are encouraged to attend.

If you cannot attend this month’s meeting; it will appear on Channel 4 for all Charter customers. You can check the Channel 4 Schedule for airing times. The best way to stay informed is for all lake front homeowners and interested parties to attend these important meetings.

This month’s agenda is not yet published. Please check the the District’s Meeting Page as that is where links to documents related to this month’s meeting will eventually  be posted.

Leave a comment

Filed under DLWID, Meeting Announcements

Lincoln City Meetings Now Stream

People interested in the decisions made by our local government now have a new tool to help them stay informed.  The City began using a new system in its June 25 Counsel meeting that streams the feed seen on Charter Channel 4 over the internet.  During the meeting the stream is live and can be viewed by anyone with an internet connection.  Once the meeting has concluded the material is available on an on-demand basis.  City Manager David Hawker indicated that each meeting will be available for months.  In addition to the City Council, the Planning Commission and the Urban Renewal Agency meetings will be available.  No word on whether the DLWID will be allowed to upgrade their broadcasts to the new system.  To view footage from the meetings, go to www.lincolncity.org and follow the link on the left side of the page for Council and Planning Commission Video.

Leave a comment

Filed under City Actions, Lakeside

Lake Level Is Going Down .53 Feet

Many Attend The Second Public Hearing

The second public hearing on lake level began the June 7th Devils Lake Water Improvement District board meeting. This hotly debated issue has occupied space in board meetings over the past four years. Tonight by my count 79 people came to the meeting to share their opinions with the board.

We will cover the discussion in a minute since I’m sure you are more interested in the outcome. After hearing the public testimony the board had a brief discussion and took action. They considered the text of a resolution offered by the public and eventually they came to a decision. The board considered modifying their water right as filed at the Oregon Water Board, which would have been almost impossible to reverse. Instead the motion was made by David Skivin and seconded by Noel Walker to Change the District’s policy concerning lake level. Specifically, it shall be the policy of the District to construct the D-River dam on June 1st each year and begin impoundment on June 15th or when the water level falls to 9.0 feet and established a impoundment height of 9.0 feet MSL. The motion passed unanimously.

The meeting began with Brian Green rendering a position on whether or not any board members should recuse themselves from the decision. He stated that it was his opinion that this was not the case as a conflict is defined as having a financial gain. He stated that no board member had any possibility of financial gain from this decision.

Continuing, the lake manager walked through the same presentation he made at the first public hearing. His material was in favor of lowering the lake and/or never installing the dam. The presentation was 84 slides long and can be found at the previous link. The manager presentation lasted 45 minutes and was followed by a board question and answer period. Those questions related to the size of the gap in the dam, the impact on blue green algae and the impact of the decision on the District’s grass carp application.

The first member of the public was able to begin at 7:15pm. A total of 33 came to the podium and spoke. 9 spoke in favor of the dam removal and 24 opposed it.

The board was presented a petition that was signed by 500 citizens interesting in the lake. The petition requests them to leave the current policy in place with the lake held at 9.53 feet. Several comments from those petitioners were read into the record. A total of 87 of those who signed left comments for the board. It was explained that these signatures were collected online, door to door, and at a few key retail outlets in town. They stated that this method insured that a cross section of lake users is represented. It has some lakefront homeowners, we have some local Lincoln City residents, and it has many signatures from those people who come to Lincoln City to enjoy the lake and the beach. They stay in hotels and vacation homes, eat in local restaurants, and shop at local businesses.

One person said the lake is filling in and that dam is accelerating that process. He felt that the removal of the dam would slow this process. Another described the wetlands like a lung that can’t be water logged and that can’t be good.

Continue reading

Leave a comment

Filed under DLWID, Lake Level, Meeting Reports

June DLWID Board Meeting Report

The Devils Lake Water Improvement District Board meeting was on Thursday June 7th at 6:00pm and was held in the City Hall Council Chambers located on the third floor of City Hall.

Public Hearing Lake Level: The District held a Public Hearing as part of its May 10, 2012 meeting. (See related article) The purpose of the public hearing was for the board to take public input on the lake level and the Districts Water Right Certificate 69267, Permit to Appropriate the Public Waters #52672 and Permit to Store the Public Waters #R-11968. There were 79 in attendance that comment during the public hearing. The Board discussed the comments and made a decision regarding the water permits. The board made a motion to Change the District’s policy concerning lake level. Specifically, it shall be the policy of the District to construct the D-River dam on June 1st each year and begin impoundment on June 15th or when the water level falls to 9.0 feet and established a impoundment height of 9.0 feet MSL. The motion passed unanimously.

Public Hearing Budget: A public hearing was held for the purpose of discussing the budget for the fiscal year beginning July 1, 2012, as approved by the Devils Lake Water Improvement District’s Budget Committee. No major changes in revenues or expenditures are expected from the previous budget. However a larger transfer to reserve than last year should be available by the end of the fiscal year 2011-2012. Public comment in this hearing suggested that the board should create a Restricted Reserve Fund would be held aside for a special projects These projects would be funded in the annual budget only after thorough review by the board including a public hearing process in order for these projects be authorized for placement in the annual budget. The Board adopted the budget at the close of the hearing.

NOTE: Given the late hour of the day I left the meeting. The balance of the report is provided from a review of the staff report. Please reference the retransmission of the meeting on channel 4 Charter Cable to verify the actions taken during the last hour of the meeting.

Continue reading

Leave a comment

Filed under Uncategorized

Is Devils Lake Mixed Up?

Could  Lake Level Impact Available Nutrients

During the informational presentation tonight as well as the May 10th meeting there were two slides that challenged the commonly held belief that more water volume equals higher dilution, and lower lake temperatures.  The slides claims the actual outcome would be increased dissolved nutrients, increased phosphorus, increased sediments from erosion and septic drain field incursion.  The slides also claim there would be higher temperatures with current lake levels. The reasoning included a suggestion that increased surface area and inundated shallows equal greater warming, while deeper water equals greater volume which takes longer to cool.

There was no further explanation of these claims.  Most of the audience and at least one board member questioned the concepts presented.  Experience has shown that generally large deep lakes seem to have cooler water than small shallow lakes.  That’s a pretty subjective observation; might there be better data available?  Since water temperature is a basic measurement of water quality it would seem that the District would have a long history of temperature readings in its records that predate the water right.  This historical temperature information would have been a valuable data set for the board to use in your deliberations but it has not been provided.

Temperature is just one part of a fundamental set of properties governing lakes; this set includes the interactions of light, temperature and wind mixing. The absorption and attenuation of light by the water column is a major factor controlling temperature. The rate at which light decreases with depth depends upon the amount of light-absorbing dissolved substances (mostly organic carbon compounds washed in from decomposing vegetation in the watershed) and the amount of absorption and scattering caused by suspended materials (soil particles, algae and detritus). Generally, 40% of the light will reach a depth of 5 meters in clear lakes; as the lake becomes more turbid; more light is absorbed and stored in the form of heat. Continue reading

Leave a comment

Filed under DLWID, Lake Level, Water Quality

D-Lake D-Day (The Sequel)

Attend June DLWID Meeting

Board Meets June 7th, 2012 6:00pm

The Devils Lake Water Improvement District Board meeting will be held on Thursday June 7th at 6:00pm. The meeting will be held in the City Hall Council Chambers, which are located on the third floor of City Hall.

There are several items on the agenda that do matter but all the attention will be focused on the second public hearing concerning lake level. The decision at the May 10th meeting was to delay construction of the dam until a final decision is made at the conclusion of the second public hearing. Should the decision be to forgo the construction of the dam this season the water will continue dropping. The lake level as of today was 9.1 feet, the lake will likely fall to 8.3 feet and farther should it be a warm summer.

The Board seemed unimpressed by the 61 in attendance at the last meeting. We need to double that number at this meeting. Please come to the meeting to voice your opinion. Bring your friends and family! Perhaps an overflow crowd will help convince the DLWID board to install the dam immediately in accordance with their current policy maintaining a lake height of 9.53 feet.

Leave a comment

Filed under DLWID, Meeting Announcements

Drilling Down On Lake Level

Revisions to Devils Lake Bathymetry

The Devils Lake Water Improvement District (DLWID) contracted with MaxDepth Aquatics, Inc. in 2004 to develop a new bathymetric map and to conduct an analysis of the sediments in Devils Lake. The objective of conducting a new bathymetric survey was to provide a high-resolution map of the lake that could serve as a benchmark against which to judge future changes. The bathymetric survey for Devils Lake was conducted on March 24-25, 2004 at a time when the lake stage was at 8.75 ft MSL.  Subsequently, it the District discovered that lake gauges were .22 ft off from the correct elevation and have since been replaced.  The result was the publication of a bathymetry map of Devils Lake.  Given the relatively low level of the lake at the time of the original study, only minor modifications were required to illustrate levels that might occur should the District fail to install the impoundment structure. To that end, we re-colored the original map moving the color gradient by one value throughout the map.

 

A careful examination of the original map on the District’s home page and our re-colored version raise some concerns.  Our revised bathymetry indicates that the swimming area at Sandpoint could be reduced in size by 20-30% and be limited to 2 to 3 feet in depth.  The point near Leisure Bay already very shallow, will have limited water available for safe navigation, less than 3 ft extending nearly 200 feet into the lake.  The lakeshore near Rock Creek becomes very shallow extending well into the lake and encompassing the entire D-River.  Water levels will be safe for boating in much of the western end of the lake as well as the Marina lobe but with 4 to 6 feet in depth, propeller turbulence will keep bottom settlement suspended all summer long.  In addition, it appears every canal as well as Horseshoe Bay will be all but empty as the water level reaches its lowest point.  For more information on how these measurements were calculated read the Updated Bathymetry and Paleolimnology of Devils Lake

Leave a comment

Filed under DLWID, Lake Level

What Might 8.3 Feet Look Like

A Picture Paints a Thousand Words

We wanted to know where the proposed summertime lake level would come to shore on our property.  The first image below illustrates today’s lake height which has fallen to 9.2 feet as well as the location that would represent the new shoreline at 8.3 feet.  The second image has been altered in photoshop to give a better visual sense of where the actual shoreline would be.  The neighbors dock which was rebuilt two summers ago to the new standards has challenging water depth in a normal summer, imagine trying to dock at the new level, perhaps a trailer would help?

Lake Shore Line at 9.2 Feet

Lake Shore Line at 8.3 Feet (simulated)

Leave a comment

Filed under DLWID, Lake Level